Customer projects undertaken using Advance Steel
The following are a number of projects undertaken with our Advance Steel software. These projects demonstrate a wide range of constructive challenges but all have incredibly complex geometrical problems which Advance Steel has had to solve.
Nigel Bowley Draughtsman Services
Neale Wade Community College, Coventry.
Download PDF Case Study
Hill and Daughter
Sub-contract structural drawing office.
Download PDF Case Study
Peter Marshall Steel Stairs Ltd
Marshall Steel Stairs is a specialist company principally engaged in the design, fabrication and installation of highly engineered steelwork, staircases and balustrade systems.
AS Fabrications (UK) Ltd
AS Fabrication (UK) Ltd is a leading supplier of Architectural Fabrication Services. Their management team have vast experience in the design, production and installation of a wide range of architectural metalwork projects, and have a workforce of qualified and experienced operatives.
Download PDF Case Study
AS Fabrications (UK) Ltd
AS Fabrication (UK) Ltd is a leading supplier of Architectural Fabrication Services. Their management team have vast experience in the design, production and installation of a wide range of architectural metalwork projects, and have a workforce of qualified and experienced operatives.
Download PDF Case Study
Advanced Draughting Services Ltd
ADSL uses the most up to date 3D steelwork modelling, detailing and material listing software available. Their software is ideal for modelling building structures, mezzanine floors, stairs, railings, balconies, ladders and other secondary steelwork.
Download PDF Case Study
Fordingbridge Plc
Fordingbridge Plc has an excellent reputation for the design and build of inspiring, sustainable curved roof structures including sustainable buildings, school canopies, covered walkways and tensile fabric structures.
Download PDF Case Study
AS Fabrications (UK) Ltd
AS Fabrication (UK) Ltd is a leading supplier of Architectural Fabrication Services. Their management team have vast experience in the design, production and installation of a wide range of architectural metalwork projects, and have a workforce of qualified and experienced operatives.
Download PDF Case Study
Fleck IMET
From staircases and handrails to balustrades, mezzanine floors, structural steel systems and retail fit-out,
FleckImet have plenty of expertise in design and fabrication of a wide range of steel elements.
Download PDF Case Study
E.C.S. Engineering Services Ltd
ECS Engineering Services is a diverse mechanical, electrical & process engineering contractor. With a full in housecapability for design and fabrication we can undertake a wide range of water projects as a package of total supply or as individual elements.
Download PDF Case Study
Peter Marshall (Fire Escapes Ltd)
Specialising in design, detail, fabrication and erection of mild steel staircases, associated structures and balustrades, Marshall Stairs has developed experience and expertise over thirty seven years to become one of the leading fabricators of steel staircases in the UK.
Download PDF Case Study
Metalfab Engineering
GRAITEC Advance Steel is winning business for Metalfab Engineering Ltd! Metalfab Engineering, specialists in staircases, raised platforms, catwalks and mezzanine floors, were looking to update their software. They were running Autodesk’s Architectural Desktop 2005, but needed a specialist steel solution that would better fit their working practices.
Download PDF Case Study
On Site Services (Gravesend) Ltd
On Site Services (Gravesend) Ltd have been trading since 1983 in the field of steel fabrication and erection. Typical projects include complete steel frame buildings, underpinning, temporary steelwork to support external façade works, mezzanine floors, stairs, balustrades and ornamental metalwork.
Download PDF Case Study
Specialised Steelwork Limited
Specialised Steelwork Limited provides a design, drawing and management service to the UK’s largest and most renowned Architectural Metalworkers & Structural Steelworkers. Previously using AutoCAD® 2008 they were looking for a more specialised steel solution.
Download PDF Case Study
On Site Services (Gravesend) Ltd have been trading since 1983 in the field of steel fabrication and erection. Typical projects include complete steel frame buildings, underpinning, temporary steelwork to support external façade works, mezzanine floors, stairs, balustrades and ornamental metalwork.Download PDF Case Study
Specialised Steelwork Limited provides a design, drawing and management service to the UK’s largest and most renowned Architectural Metalworkers & Structural Steelworkers. Previously using AutoCAD® 2008 they were looking for a more specialised steel solution. Download PDF Case Study
Garmisch-Partenkirchen Olympic Ski Jump
Constructed by Bitschnau GmbH the Olympic ski jump - nicknamed the 'Olympic Cantelever' - was officially opened in December 2008 and will host the International Four Hills Tournament in January 2009. This renown competition has been hosted in the town for the last 55 years.
The spectacular design of the jump has gained international recognition and has been nominated for the Mies van der Rohe Award 2009.
Zlote Tarasy Golden Terraces
The architecturally elaborate, aesthetically beautiful Zlote Tarasy Golden Terraces shopping centre in Warsaw, Poland was constructed by the industry specialists Waagner-Biro Stahl-Glas-Technik.
The New Milan Fair
The contemporary vela roof of the New Milan Fair has an increadibly complex design reminiscent of the Alps. The speed at which the 1.3 kilometre long free form roof was modelled was achieved using Advance Steel and its automatic drawing creation.
Bermuda Weather Radar Tower
Designed to help with the prediction of Bermudas' unpredictable weather changes the Radar Tower had to be designed to withstand hurricane velocity winds.
Download PDF Case Study
The Neiderwartha Bridge
The Niederwartha bridge - completed in 2008 - which spans the River Elba between Niederwartha and Meissen is the longest cable stayed bridge in Germany and consists of 1232 tonnes of steel.
3V-3 Booster Heater
The 3V-3 Booster Heater designed by Heurtey Petrechem Romania is the latest generation in tubular process fired heaters.
The Zeotermeer UFO
A UFO shaped building in the centre of Zeotermeer Advance Steel was specifically chosen for this project due to its versitility; almost all the beams of this 290 tonne project are curved and so a key required for software was that it was able to handle the complex geometry involved.
Audi N-24 Production Hall
Audi's new production hall located in Inglostadt, Germany covers a huge area of 5750 square metres. The job was so vast that they required software that could work with an unlimited amount of parts.
Norwich Theatre Royal Modernisation
The £10million modernisation of the Theatre Royal, Norwich was reopened in November 2007 and has transformed the Theatre with 7 tonnes of new steel work creating a new Royal Circle.
Download PDF Case Study
Duisburg Casino Canopy
Creating a funnel effect to draw visitors in, the Duisburg casino canopy weighs 50 tonnes and is suspended 10 metres in the air.
Download PDF Case Study
Warehouse for the containment of explosive products
A steel arc, with a span of 72 metres but built of straight beams, this structure was completely modelled in 3 weeks due to Advance Steel.