GRAITEC UK - Home
    • Press Releases
    • GRAITEC Group
    • Vacancies
    • Contact Us
    • Advance Steel
    • Advance Concrete
    • Advance Design
    • SuperSTRESS
    • Downloads
    • Maintenance
    • Demos
    • FAQ's
    • Desktop Sharing
    • Training
    • Consultancy
    • Programming
    • Advance Steel
    • Advance Concrete
    • Advance Design
    • SuperSTRESS
Newsletter Contact Events Graitec Advantage Login

Contact Us
Tel: 0844 543 8888
Calls may be recorded for training purposes
Email: mail@graitec.co.uk

Facebook LinkedInYouTube




Advance Steel References

Advance Concrete References

Advance Design References

Customer Quotes




"The software is a very powerful tool which is easy to understand and quick to learn how to use. I have used the support team on many occasions and I have found the response times very quick with the least amount of disruption to my work."

Bridge Engineer MICE, Halcrow Group Ltd



References

Customer projects undertaken using SuperSUITE   

 

ISA Sports City, Bahrain 

ISA Sports City, Bahrain

ISA Sports City is a major construction project that aims to harness the Olympic ambitions of the kingdom's sport lovers. While many aspects of the entire BD40 m project are only just commencing, it is the recently completed Hall A, in the shape of a doughnut and featuring a six-lane athletics track circumventing a large open ground that will play host to handball, that has caught the imagination.

Download PDF Case Study

  

 

Goodwood Festival of Speed Structure

Goodwood Festival of Speed StructureDesigned by Gerry Judah and fabricated by Capita Bobrowski this sculpture was the centre piece of the Goodwood 2008 Festival of speed. 

 Download PDF Case Study



 

 

 

Isle of Sheppey Crossing

Isle of Sheppey CrossingConstructed by Cass Hayward LLP  and standing at 1.27 km long this structure had to overcome complex construction conditions. These were subsequently recognised when the bridge recieved the BCSA Award 2007.

Download PDF Case Study

 

 

 

City Island Development Leeds

City Island Development LeedsCapita Symonds were responsable for Civil and Structural Engineering services on this £32m project. The idiosyncratic layout due to the curved building shape left SuperSUITE as the obvious choice of software for the project.

Download PDF Case Study 

 

 

Bangkok Subway

Bangkok SubwayCrossing two major drainage canals this $150m project carried out by independent consultant Gordon Belton and Halcrow Asia used SuperSUITE to model grillages and heslab structure.

Download PDF Case Study

  

 

St James' Hospital

St James' HospitalDesigned by Faber Maunsell using SuperSTRESS this project upon its official opening on the 17July 2008 became one of Europe's largest cancer centres.

Download PDF Case Study

   

 

A380 Overbridge

A380 OverbridgeIn the case of the A380 overbridge SuperSTRESS was used by Devon County Council to help plan a construction project with minimal delays.

Download PDF Case Study 

 

 

 

Hungerford Footbridge

Hungerford FootbridgeThe Hungerford Bridge has a quirky history; originally built by Isambard Kingdom Brunel but then replaced in 1864 by a railway bridge that sat on Brunel's original brick butresses. After a number of refurbishments and extensions throughout the 20th Century, the Golden Jubliee Footbridges, the latest update was completed in 2002. SuperSTRESS was used to model this incredibly complex project.

............................................................. Download PDF Case Study

 

Butterfly Bridge

Butterfly BridgeThe result of a competition run for the Royal Institute of British Architects the bridge. The Complex geometry involved to create this aesthetically impressive structure was handled by Graitec UK's SuperSTRESS.

Download PDF Case Study



 

Avonmouth Bridge

Avonmouth BridgeFrom 2002 to 2004 the Avonmouth bridge, which carries the M5 to Bristol was upgraded so that its capacity could be increased. Hyder Consulting assisted the Highways agency in widening and strengthening the bridge.

Download PDF Case Study

 

Bluewater Shopping Centre

Bluewater Shopping CentreBluewater is the UK's second largest shopping centre, with 1.6million square feet of retail space. However for the Waterman Partnership the size was not the only construction issue; the intricate roof, atrium and facade also needed to be modelled and quickly. 

Download PDF Case Study

 

 

 

 

South Quay Footbridge

South Quay FootbridgeThe design requirements for the South Quay footbridge in Canary Wharf necessitated an extremely adaptable bridge that would become two seperate bridges once long term construction plans for Canary Wharf had been completed.

Download PDF Case Study

 

 

Lords Cricket School

Lords Cricket SchoolImprovements to Lords Cricket School bought the centre inline with international standards giving Cricketers a World class practice area for out of season months. The roof was designed by Price and Myers using SuperSUITE to be both architecturally striking and functional.

Download PDF Case Study

 

  

 

 

Pepsi Max

Pepsi Max Big OneWhen it opened in 1994 the Pepsi Max was the Worlds tallest and steepest rollercoaster. Even after 15 years the rollercoaster can still claim to be the UK's tallest ride standing at 235ft. For Allott and Lomax extensive difficulties came as the rollercoaster has to be designed around other buildings and for this they used SuperSUITE.

Download PDF Case Study

 

 

 

   

 

Kingston Crown Court

Kingston Crown CourtFor Kyle Steward Limited, now part of the Hollandsche Beton Group, Graitec UK's SuperSUITE software helped facilitate important advances in increasing productivity and their competitiveness in going after tendered projects.

Download PDF Case Study

 

 

 

Great Yarmouth Sea Life Centre

Great Yarmouth Sea Life CentreThe Great Yarmouth Sea Life Centre provided the Fordham and Johns Partnership an interesting professional diversion, however there were a number of aspects of the project that were anything but normal; thus SuperSUITE was used as it had the flexibility to cope with the demands of the project.

Download PDF Case Study

 

 

Hinxton Hall

Hixton HallThe construction of Hinxton Hall, which was completed in 1995, was an important step in Genome research.

Download PDF Case Study

 

 

®1986-2013 GRAITEC
Graitec Group | sitemap | contact